KMA GSICS Products review

This page is dedicated to the review of KMA GSICS products. KMA has the following products

  • GK2A - IASI/CrIS product ( submitted 11/26/2020)
  • COMS-IASI Cross calibration (NRT) Product ( submitted 23/02/2016)

The COMS-IASI product was the first product submitted by KMA for acceptance and went through a full GPPA. All subsequent GSICS products submitted by KMA will/are being treated as a family of instruments and would undergo a shortened GPPA.

GK2A - IASI/CrIS product

On 11/26/2020 KMA submitted the Gk2A Vs IASI/CrIS product for acceptance via the GPPA. The documents submitted are ATBD and GPAF

On 5/3/2024 KMA provided the links to NRT GK2A Vs IASI-B and C /SNPP and N20 CrIS products under the family of instrument catagory. Following a successful review by GDWG Vice Chair Manik Bali, GCC Director Larry Flynn accepted the products in demo phase ( see below)

The products were reviewed using the colab files

https://gsics.eumetsat.int/thredds/catalog/gk2a-ami-metopb-iasi-demo-nrtc/catalog.html (GK2A - IASI/B)

In the above W_KR-KMA-NMSC,SATCAL+NRTC+GEOLEOIR,GK2A+AMI-MetopB+IASI_C_RKSL_20200418000000_demo_01.nc has only 8 channels instead of 10. But all other files are file. Was able to process the data here

https://gsics.eumetsat.int/thredds/catalog/gk2a-ami-metopc-iasi-demo-nrtc/catalog.html (GK2A - IASI/C)

The colab review is here

https://gsics.eumetsat.int/thredds/catalog/gk2a-ami-noaa20-cris-demo-nrtc/catalog.html (GK2A - NOAA20/CrIS)

The colab review is here

https://gsics.eumetsat.int/thredds/catalog/gk2a-ami-snpp-cris-demo-nrtc/catalog.html (Gk2A - SNPP/CrIS)

The Colab review is here

GCC Director Larry Flynn communicated via email to EP Chair Bojan Bojkov and GRWG Chair Fangfang Yu that the product has been accepted in Demo Phase. The GSICS Product catalog was subsequently updated.

Lawrence E Flynn - NOAA Federal

2:39 PM (1 hour ago)

to Bojan, Fangfang, 황의동, me, Mounir

Bojan and Fangfang,
Manik has surveyed the proposed four products at the Demonstration Maturity Level:
Gk2 versus SNPP/N20 CrIS & Metop B/C IASI

I am approving them for implementation in the GSICS Catalog under the family of

instruments criteria.

Larry Flynn, GCC Director

COMS-IASI Cross calibration (NRT) Product

On 23 Feb 2016 KMA submitted a revised version of the COMS - IASI/AIRS product to the GCC. The files that were submitted are 1) Data File 2) ATBD 3) GPAF .

Daily NRT products can be found here

Masaya Takahashi provided an initial review. Manik Bali offered KMA to use GPPA tools in case they help.

About the product

By- Manik Bali and Hyesook Lee

This is a high value product. Product is well known in the community. Its use in improving SST has been demonstrated. Related work was published in the GSICS Quarterly see here. It has also been published in internationally accepted and respected journals. This product has been generated along the lines of existing GSICS products and GSICS members are familier with the methods used to generate this product. (see below)

Kim, D., M. H. Ahn, and M. Choi, 2015, Inter-comparison of the infrared channels of the meteorological imager onboard COMS and hyperspectral IASI data. Advances in Atmospheric Sciences, 32:7, 1-13, DOI: 10.1007/s00376-014-4124-1.

Park, E. B., K. S. Han, J. H. Ryu, and C. S. Lee, 2013, Sensitivity analysis of satellite-retrieved SST using IR data from COMS/MI. Korean Journal of Remote Sensing, 29:6, 589-593, DOI:10.7780/kjrs.2013.29.6.1.

Park, E. B., K. S. Han, J. M. Yeom, C. S. Lee, J. H. Ryu, H. Kim, and D. Kim, 2015, Effects of GSICS correction on estimation of sea surface temperature using COMS data. International Journal of Remote Sensing, 36:4, 1026- 1037, DOI: 10.1080/01431161.2015.1007249

These publications can be treated as Validation and Impact reports and fulfill an important criterion.

So we can go with less number of reviewers.

Proposed GPPA

Typically three GPAT reviewers are required for a product to be accepted into GSICS Demo Phase. Considering that this product has been

1.Produced routinely at KMA here

2 Peer reviewed publications (listed above) on the product exist

3.Directly used for SST generation at KMA

This condition was relaxed to 2 reviewers. The two reviewers are Manik Bali and Masaya Takahashi. The recommendation of these two reviewers was given to the GRWG/GDWG Chairs who consented to the reccomended the acceptance of the product in the Demo Phase.

Currently Doheyong Kim is the Chair of the GRWG and procedurely he has to reccommend the acceptance of the product in Demo Phase. However since he is from KMA so to avoid any conflict of interest, we have sought Tim Hewison's (EUMETSAT, GRWG Vice Chair) recommendation.

Comments from Masaya (GPAT member) and Manik Bali

Ensure that the Metadata conventions are followed properly. Changes implemented. ( See comments here and response here)

The product is being produced routinely at KMA and pushed to the EUMETSAT GSICS Server ( here) .

Manik Bali Comments-> I conducted a review of the related publications of the product. Also reviewed the product ATBD and GPAF. I found this product extremely usefull to the community at large and would suppor the acceptance of the product into the Demo Phase.

Peter Miu

I also like to congratulate KMA on the COMS/MI product

Tim Hewison Comments-> Sent: 7 April 2017

I would like to congratulate KMA on their progress on this product, and thank Manik for putting together the Wiki topic summarising its progress through the GPPA.

My only additional comment is that it is not clear from the GPAF or ATBD whether any comparisons with AIRS have been included in the product. I would like to see this clarified.

Masaya Takahashi Comments-> Sent: 19 April 2017 07:12

First of all, I would like to congratulate KMA for your great progress on the COMS/MI product. (comments ATBD, GPAF)

Attached here please find my comments from a viewpoint of JMA GPAT member. It would be great if you could update the ATBD before entering Pre-operational Phase - so there is nothing special to do at this stage. On the other hand, I have two questions which I commented in the GPAF.

1) Do you expect that two COMS/MI products using both AIRS and IASI as references? We received only one product which refers IASI. As Tim pointed out, some comparison results may be requested for AIRS one.

2) Do you submit only Near Real Time Correction (NRTC)? If you also plan to submit Re-Analysis Corrections (RAC), would you please provide a sample product?

Once these questions are clarified, I would encourage COMS/MI infrared GSICS Corrections to enter Demonstration Phase.

Dohyeong Kim Thu, Apr 20, 2017 at 7:25 PM
to Masaya, Tim, Lawrence, me, 우진, 이혜숙, Fangfang, Peter, xuna

Dear Masaya, Pete, Tim and Manik

Thank you very much for your very good comments and suggestions. As for the Masaya's questions: 1) Yes currently KMA provided COMS/MI products only using IASI as reference. KMA had already had products using both IASI and AIRS, thus we can provide both products together.
2) Yes we provided only NRTC. In addition to NRTC, we can provide RAC as well.

About submitting directly to Pre-Op

Point was discussed and it was thought that this could be applied to COMS (KMA) as well as AHI-IASI (JMA) intercomparision. The idea is to utilize past experience on reaching this stage ( NOAA and EUMETSAT have been) to quickly fulfill the GPPA requirements.

Product Submission Phase

  1. Fill out Sections I, II, III.1.A.1, and III.1.A.2 of the GSICS Product Acceptance Form (GPAF). Also, fill out Section III.1.B (ATBD) of the GPAF, but during the Submission Phase the ATBD needs only to be a preliminary version. The ATBD could be a journal article, technical memorandum or other documentation of the method used to make the product.
    • Who: Product provider
    • Done
  2. Submit the GPAF and preliminary ATBD for review to the GSICS Product Acceptance Team (GPAT) via the GSICS Coordination Center (GCC) Deputy.
    • Who: Product provider
    • Done
  3. Determine if the GPAF is filled out correctly and decide if the product theoretical basis is adequate and the product scope is within the GSICS domain.
    • Who: GPAT
    • Due: 6 weeks after the GPAF submission
    • Done
  4. GPAT feedback given to the Product provider.
    • Who: GCC Director
    • Due: 7 weeks from GPAF submission
    • Done
  5. Upload a sample file to a GSICS data server if GPAT feedback is affirmative.
    • Who: Product provider, GDWG Chairman
    • Due: One week after GPAT feedback regarding GPAF form submission
    • Done
  6. Determine if the sample file follows the GSICS netCDF and file naming conventions.
    • Who: GDWG Chairman
    • Due: 2 weeks after successful product sample file upload
    • Done
  7. Remediate any GPAF issues according to the GPAT feedback.
    • Who: Product provider, GCC Director
    • Due: Within 20 days after sending GPAT feedback to the Product provider
    • Done
  8. Once all issues are resolved, the product enters the Demonstration Phase.
    • Who: GCC Director in consultation with the GPAT
    • Due: Within 90 days of the GPAF submission
GCC Director Larry Flynn Via E-Mail:21 April 2017 informed the GSICS EP and KMA that the KMA product has been accepted in GSICS in Demo Phase( Message to EP here).

Demonstration Phase

  1. Notify the Executive Panel about the Product entering Demonstration Phase.
    • Who: GCC Director
    • Due: Two weeks after the Product enters Demonstration Phase. done
  2. Arrange for routine upload of the Product to a GSICS data server and agree on file retention policy.
    • Who: GDWG Chairman, GRWG Chairman, and Product provider
    • Due: One month after entering the Demonstration phase (doing now)
  3. Notify GSICS users and invite feedback from them.
    • Who: GCC Director
    • Due: As soon as routine upload is completed and the file retention policy is resolved. : Routine update issues resolved. Worked Mingjun (KMA) closely with Manik Bali (GPAT Reviwer and GDWG Member). Product plotted and correction coefficients applied.
  4. Complete documents associated with GPAF Sections III.1.B (ATBD) and III.1.C (product traceability to standards) and submit them to the GCC Director.
    • Who: Product provider
    • Due: Three months after entering the Demonstration phase N/A
  5. Examine the submitted documents (ATBD and product traceability to standards).
    • Who: GPAT and product users
    • Due: One month after GCC received the documents N/A
  6. Remediate any document issues according to the GPAT and user feedback.
    • Who: Product provider, GCC Director
    • Due: One month after receiving GPAT feedback Feedback from User Feedback incorporated to the satisfaction of reviewer. Product already in use ( please see published references above)
  7. Complete documents associated with GPAF Sections III.2.A (radiative transfer models) and III.2.B (cal/val supporting measurements).
    • Who: Product provider
    • Due: Six months after entering the Demonstration phase Documents Up to Date
  8. Collect and disseminate user feedback regarding product's data usability and format
    • Who: Product users, GCC Director
    • Due: Six months after entering the Demonstration phase Doing with this review
  9. Examine the submitted documents (radiative transfer models and cal/val supporting measurements).
    • Who: GPAT
    • Due: One month after GCC received the documents N/A
  10. Remediate any document or data issues according to the GPAT and user feedback.
    • Who: Product provider, GCC Director
    • Due: One month after receiving GPAT feedback N/A
  11. [Major milestone] Make a consensus decision whether or not to continue the Product acceptance process.
    • Who: GPAT
    • Due: Two weeks after the remediation process ends for the documents regarding the radiative transfer models and cal/val supporting measurements N/A
  12. Notify the Executive Panel on the status of the Product's acceptance process.
    • Who: GCC Director
    • Due: Two weeks following the GPAT decision on the Product's acceptance process. (Will do now)
  13. Complete and submit Section III.3.A (Product quality) of the GPAF.
    • Who: Product provider
    • Due: Ten months after entering the Demonstration phase ( Product produced since 2015 )
  14. Examine the submitted Product quality document.
    • Who: GPAT
    • Due: One month after GCC receives the document
  15. Remediate any document issues according to the GPAT feedback.
    • Who: Product provider, GCC Director
    • Due: One month after receiving GPAT feedback N/A
  16. Once all issues are resolved, the Product enters the Pre-operational Phase.
    • Who: GCC Director in consultation with the GPAT
    • Due: Within one year of the product entering the Demonstration Phase Product to become Pre-Operational

Pre-operational Phase

  1. Send notification and GPAT Product recommendations to the Executive Panel regarding the Product.
    • Who: GCC Director
    • Due: Two weeks after the Product enters the Pre-operational Phase. done
  2. Executive Panel review of the GPAT recommendations. Executive Panel feedback regarding the product sent to the GCC Director.
    • Who: GSICS Executive Panel
    • Due: Six weeks after being notified None received/done
  3. GCC Director notifies the Product provider about the Executive Panel feedback.
    • Who: GCC Director
    • Due: Two weeks after receiving feedback from the Executive Panel None received/done
  4. Complete documents associated with GPAF Sections III.2.C (Analysis software documentation), III.2.D (Product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide) and submit the documents to the GCC.
    • Who: Product provider
    • Due: Three months after entering the Pre-operational phase None received/done
  5. Examine the submitted documents (product version control plan, operations and distribution plan, and data user's guide).
    • Who: GPAT
    • Due: One month after GCC received the documents None received/done
  6. Remediate any documentation and overall product issues following the Executive Panel and GPAT feedback.
    • Who: Product provider, GCC Director
    • Due: One month after receiving feedback Issues related to Product Transmission to EUMETSAT THREDDS server and date in the product was solved to the satisfaction of GDWG Member Manik Bali. Product tested for plotting and application of GSICS Corrections (View product at https://www.star.nesdis.noaa.gov/smcd/GCC/ProductCatalogImages.php)
  7. GPAT reviews the remediation material and decides if the requirements are now satisfied. Sends final recommendation to the GCC Director.
    • Who: GPAT and GCC Director
    • Due: Thee weeks following conclusion of the document remediation period. Inform the Chairs and GCC Director
  8. GCC Director notifies the Executive Panel that the product has satisfied all the requirements for entering the Operational Phase.
    • Who: GCC Director
    • Due: One week following the GPAT review.
I Attachment Action Size Date Who Comment
20170330_GEO_LEO(Masayas comment).xlsxxlsx 20170330_GEO_LEO(Masayas comment).xlsx manage 29 K 30 Mar 2017 - 13:53 ManikBali  
ATBD_for_KMA_Inter-Calibration_of_COMS-IASI_v1.0.docxdocx ATBD_for_KMA_Inter-Calibration_of_COMS-IASI_v1.0.docx manage 625 K 09 May 2016 - 01:29 ManikBali  
ATBD_for_KMA_Inter-Calibration_of_COMS-IASI_v1.0_MT.docxdocx ATBD_for_KMA_Inter-Calibration_of_COMS-IASI_v1.0_MT.docx manage 625 K 19 Apr 2017 - 14:54 ManikBali Masaya Comments on ATBD
GSICS_GCC_GPAF_V01.2.docdoc GSICS_GCC_GPAF_V01.2.doc manage 355 K 30 Mar 2017 - 14:03 ManikBali  
GSICS_GCC_GPAF_V01.2_MT.docdoc GSICS_GCC_GPAF_V01.2_MT.doc manage 355 K 19 Apr 2017 - 14:55 ManikBali GPAF_MT
GSICS_GCC_GPAF_V01.3(KMA_v1).docdoc GSICS_GCC_GPAF_V01.3(KMA_v1).doc manage 358 K 26 Nov 2020 - 16:23 ManikBali GK2AGPAF
GSICS_GCC_GPERF_V01.0_COMS_MB.docdoc GSICS_GCC_GPERF_V01.0_COMS_MB.doc manage 992 K 05 Feb 2019 - 21:10 ManikBali GPERF by Manik Bali
atbd_for_kma_gsics_of_gk2a(ver1).docdoc atbd_for_kma_gsics_of_gk2a(ver1).doc manage 2 MB 26 Nov 2020 - 16:24 ManikBali GK2AATBD
coms_iasi_acceptance (1).docxdocx coms_iasi_acceptance (1).docx manage 22 K 25 Apr 2017 - 15:35 ManikBali Acceptance Document
samples.zipzip samples.zip manage 8 K 09 May 2016 - 01:27 ManikBali  
Topic revision: r16 - 05 Mar 2024, ManikBali
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSICS Wiki? Send feedback