GSICS Annual Meeting 17-21 March 2025 in Changchun, Jilin Province, China

Agenda

Agenda is here. The "Agenda in prep" tab gives an high level over view of current state of plan and the "Meeting Agenda 2025" gives a detail presentation wise agenda as is being planned by Session Chairs.

Minutes

  • To edit the Meeting Minutes Document click here
  • Access 2024 actions here ( get Action Id) . Update 2024 actions click here. Navigate to the correct tab and update the status. ( e.g A.GDWG.20240301.1 ) will be found in GDWG tab
  • Access 2023 actions here ( get Action Id) . Update 2023 actions click here. Navigate to the correct tab and update the status. ( e.g A.GDWG.20230301.1 ) will be found in GDWG tab

Logistics

  • Hotel Information: Holiday Inn Changchun Jingyue Hotel, located at No. 3070 Jingyue Road, Nanguan District, Changchun, Jilin, China
  • Details about logistics can be found here

<iframe width="1802" height="1450" frameborder="0" scrolling="no" src="https://umd0-my.sharepoint.com/personal/mbali_umd_edu/_layouts/15/Doc.aspx?sourcedoc={f2d4358e-1a1a-46b6-89c6-d03add49d460}&action=embedview&wdAllowInteractivity=False&wdHideGridlines=True&wdHideHeaders=True&wdDownloadButton=True&wdInConfigurator=True&wdInConfigurator=True"></iframe>

Preparatory Meeting Minutes

Chang Liu (liuc (AT) cma.gov.cn) gave a presentation on the logistics.
  • The meeting would be hybrid
  • An excursion is planned on 21 March 2025
  • Pickup and drop from Hotel to Venu would be provided

Bojan and Simon Elliott requested to move the GDWG breakout session from Wed.19 March morning to Thu. 20 March morning (to allow them to attend)
this needs a swap with VISNIR (part 2 session) or with the MW session.

Larry provided suggestions for topics on each session.
  • A.GRWG.20250109.1: Mounir to work with Manik to collect content for the SOS report
  • AGRWG.20250109.2: Mounir to work with GRWG to finalize the meeting agenda
  • A.GRWG.20250109.3: Tom Stone to prepare discussion on GSICS interaction with CALCON community.
  • A.GRWG.20250109.4: Mounir to contact Nigel Fox and Xiaoxiong(Jack) Xiong to present summary on pre-launch at the Annual Meeting
  • A.GRWG.20250109.5: Mounir to work with GRWG members to organize a followup preparatory meeting.
  • A.GRWG.20250109.6: GDWG and VISNIR to workout a session swap

Template Agenda Discussion

Date Time GMT+8 Session Name Webex Link Meeting Number Meeting Password
3/17/2025 08:30-13:00 Mini Conference https://ciomp.webex.com/ciomp/j.php?MTID=m2f2f7a8c98f0fdc25668dde48c82dd14 2515 607 7360 GSICS2025
3/17/2025 13:30-18:00 VIS/NIR + Lunar PM https://ciomp.webex.com/ciomp/j.php?MTID=m04e10d6184b99328dbdbb6479d5cb759 2515 926 3892 GSICS2025
3/17/2025 13:30-18:00 SWx https://ciomp.webex.com/ciomp/j.php?MTID=mebe35f348879b4ae6bd0e2f0660f6c3d 2514 019 0437 GSICS2025
3/18/2025 08:00-12:00 VIS/NIR + Lunar AM https://ciomp.webex.com/ciomp/j.php?MTID=me6b7636800b6f0c971498bfa0c9302bb 2519 083 0630 GSICS2025
3/18/2025 13:30-18:00 IR PM https://ciomp.webex.com/ciomp/j.php?MTID=md9a92e10fe8bc08910c7c7ee9a1af18e 2514 999 0653 GSICS2025
3/18/2025 16:00-18:00 GDWG: GSICS Data and Products Server - GSICS 2025 https://ciomp.webex.com/ciomp/j.php?MTID=md49c180b4c79c468144c33105405d8bf 2517 379 9501 GSICS2025
3/19/2025 08:00-11:00 UVN-S AM https://ciomp.webex.com/ciomp/j.php?MTID=m4dbb6abbe6625844c95febfa6921c786 2515 495 1583 GSICS2025
3/19/2025 08:00-11:00 MW AM https://ciomp.webex.com/ciomp/j.php?MTID=mcc8bcb245bea9b78590fc54e9706cc4e 2516 603 1393 GSICS2025
3/19/2025 14:40-18:00 UVN-S PM https://ciomp.webex.com/ciomp/j.php?MTID=ma4021e92209899227fbcf7e9c3a7ff83 2514 606 5107 GSICS2025
3/19/2025 14:40-18:00 MW PM https://ciomp.webex.com/ciomp/j.php?MTID=mc8b725816663053bc7ea44f8f41b22b2 2518 097 6178 GSICS2025
3/20/2025 08:30-12:00 IR AM https://ciomp.webex.com/ciomp/j.php?MTID=m5ff91386582d30dd9761d4979b4e5b41 2515 168 3863 GSICS2025
3/20/2025 09:00-12:00 GDWG https://ciomp.webex.com/ciomp/j.php?MTID=mbd4b7edbd224b454a654294ec606391f 2514 301 4296 GSICS2025
3/20/2025 13:30-18:00 Agency Report https://ciomp.webex.com/ciomp/j.php?MTID=m529bfd3c0cd0a0d4fbdf7fdcfb8c850e 2513 119 5548 GSICS2025
3/21/2025 08:00-13:00 Cross-cutting and Planning https://ciomp.webex.com/ciomp/j.php?MTID=m14233832b8cdc922d0b8232203f4f159 2516 007 3702 GSICS2025
3/21/2025 13:30-18:00 EP Meeting https://ciomp.webex.com/ciomp/j.php?MTID=mcfe4be36d257e634fa32366a2bc52fbc 2511 034 8654 GSICS2025
I Attachment Action Size Date Who Comment
11k_GSICS Data and Product Server migration proposal.pptxpptx 11k_GSICS Data and Product Server migration proposal.pptx manage 27 MB 02 Apr 2025 - 10:14 TimHewison  
12s_Bali_GCC_Annual_2025_final.pptxpptx 12s_Bali_GCC_Annual_2025_final.pptx manage 5 MB 26 Mar 2025 - 13:36 LarryFlynn Talk 12s
13a_GDWG_SessionReport_20250320_PC_V0.0.pptxpptx 13a_GDWG_SessionReport_20250320_PC_V0.0.pptx manage 7 MB 27 Mar 2025 - 15:23 TimHewison  
13d_Stone_GSICS-CALCON_proposal.pptxpptx 13d_Stone_GSICS-CALCON_proposal.pptx manage 93 K 27 Mar 2025 - 15:26 TimHewison  
13e_Stone_Lunar_Subgroup_session_report.pptxpptx 13e_Stone_Lunar_Subgroup_session_report.pptx manage 67 K 27 Mar 2025 - 15:27 TimHewison  
13f_Chengli Qi_IR_GSCIS_20250321.pptxpptx 13f_Chengli Qi_IR_GSCIS_20250321.pptx manage 4 MB 27 Mar 2025 - 15:34 TimHewison  
13g GRWG MW Report_FIS.pptxpptx 13g GRWG MW Report_FIS.pptx manage 16 MB 27 Mar 2025 - 15:17 TimHewison  
13h_VISNIR_2025_03.pptxpptx 13h_VISNIR_2025_03.pptx manage 43 K 27 Mar 2025 - 15:29 TimHewison  
13i GRWG SWx report.pptxpptx 13i GRWG SWx report.pptx manage 2 MB 27 Mar 2025 - 15:31 TimHewison  
13j_Flynn_UVN-S_Session.pptxpptx 13j_Flynn_UVN-S_Session.pptx manage 7 MB 26 Mar 2025 - 13:34 LarryFlynn Talk 13j
1f_Absolute Measurement System for Terrestrial Reflected Spectral Raidance -Xin Ye.pptxpptx 1f_Absolute Measurement System for Terrestrial Reflected Spectral Raidance -Xin Ye.pptx manage 20 MB 28 Mar 2025 - 16:23 TimHewison  
1g_Research Progress on Infrared Benchmark Payload-.pptxpptx 1g_Research Progress on Infrared Benchmark Payload-.pptx manage 38 MB 28 Mar 2025 - 16:32 TimHewison  
1h-Overview of FY-3G HAOC Instrument and On-orbit Performance.pptxpptx 1h-Overview of FY-3G HAOC Instrument and On-orbit Performance.pptx manage 27 MB 28 Mar 2025 - 16:37 TimHewison  
1i-Radiometric Calibration using Artificial Intelligence-CHEN Boyang.pptxpptx 1i-Radiometric Calibration using Artificial Intelligence-CHEN Boyang.pptx manage 15 MB 28 Mar 2025 - 16:40 TimHewison  
1k_GDWG_Report_20250317_PC_V0.0.pptxpptx 1k_GDWG_Report_20250317_PC_V0.0.pptx manage 7 MB 28 Mar 2025 - 16:43 TimHewison  
1m GRWG report 2025.pptxpptx 1m GRWG report 2025.pptx manage 2 MB 16 Mar 2025 - 16:56 MounirLekouara GRWG report
5b Monitoring MTG-I1 FCI IR Calibration Using GSICS Inter-Calibration Algorithms.pptxpptx 5b Monitoring MTG-I1 FCI IR Calibration Using GSICS Inter-Calibration Algorithms.pptx manage 106 MB 27 Mar 2025 - 13:27 TimHewison  
5c_Current_status_of_AMI_IR_product.pdfpdf 5c_Current_status_of_AMI_IR_product.pdf manage 2 MB 27 Mar 2025 - 13:18 TimHewison  
5f_GSICS_2025_IR_sesstion_Likun_Wang_Sounder_Iamger.pptxpptx 5f_GSICS_2025_IR_sesstion_Likun_Wang_Sounder_Iamger.pptx manage 39 MB 27 Mar 2025 - 13:18 TimHewison  
5g_Koyamatsu_AHI_Collocation.pptxpptx 5g_Koyamatsu_AHI_Collocation.pptx manage 1 MB 27 Mar 2025 - 13:18 TimHewison  
5h_GSICS_Relative_SRF_Retrieval_2025_EUM (1).pptxpptx 5h_GSICS_Relative_SRF_Retrieval_2025_EUM (1).pptx manage 11 MB 27 Mar 2025 - 13:18 TimHewison  
6a_Heesung_Chong_TEMPO.pptxpptx 6a_Heesung_Chong_TEMPO.pptx manage 13 MB 26 Mar 2025 - 13:18 LarryFlynn Talk 6a
6b_Sriharsha_Madhavan_OMPS.pptxpptx 6b_Sriharsha_Madhavan_OMPS.pptx manage 4 MB 26 Mar 2025 - 13:20 LarryFlynn Talk 6b
6c_OMPS_Larry_Flynn_Briefed.pptxpptx 6c_OMPS_Larry_Flynn_Briefed.pptx manage 6 MB 26 Mar 2025 - 13:21 LarryFlynn Talk 6c
6d_UVNS_2025_Rosenberg_oco23trend.pptxpptx 6d_UVNS_2025_Rosenberg_oco23trend.pptx manage 4 MB 26 Mar 2025 - 13:22 LarryFlynn Talk 6d
6e_UVNS2025_GOSAT_series_Shiomi.pptxpptx 6e_UVNS2025_GOSAT_series_Shiomi.pptx manage 8 MB 26 Mar 2025 - 13:22 LarryFlynn Talk 6e
6f_The Calibration results of the OMS-Nadir onboard FY-3F -v1.pptxpptx 6f_The Calibration results of the OMS-Nadir onboard FY-3F -v1.pptx manage 12 MB 26 Mar 2025 - 13:23 LarryFlynn Talk 6f
6g_Yuan_Li_OMSL_update.pptxpptx 6g_Yuan_Li_OMSL_update.pptx manage 10 MB 26 Mar 2025 - 13:24 LarryFlynn Talk 6g
6h_Li_An Overview to Pre-launch Calibration of FY-3F OMS-Limb.pptxpptx 6h_Li_An Overview to Pre-launch Calibration of FY-3F OMS-Limb.pptx manage 4 MB 26 Mar 2025 - 13:25 LarryFlynn Talk 6h
6i_Flynn_UVN-S_Annual.pptxpptx 6i_Flynn_UVN-S_Annual.pptx manage 413 K 26 Mar 2025 - 13:26 LarryFlynn Talk 6i
7b_GSICS_RadTT_Focus_Group_Report_2025.pptxpptx 7b_GSICS_RadTT_Focus_Group_Report_2025.pptx manage 310 K 25 Mar 2025 - 07:38 TimHewison  
7c Yang lunar mw progress_031725.pdfpdf 7c Yang lunar mw progress_031725.pdf manage 11 MB 26 Mar 2025 - 15:36 TimHewison  
7d Hewison - Update on SNO Vicarious Calibration Focus Group.pptxpptx 7d Hewison - Update on SNO Vicarious Calibration Focus Group.pptx manage 1 MB 25 Mar 2025 - 07:20 TimHewison  
7e Kroodsma <a class="foswikiNewLink" href="/bin/edit/Development/WHyMSIE?topicparent=Development.AnnualEP2025" rel="nofollow" title="Create this topic">WHyMSIE</a>.pdfpdf 7e Kroodsma WHyMSIE.pdf manage 4 MB 26 Mar 2025 - 15:30 TimHewison  
7f Gambacorta_2025_GSICS.pdfpdf 7f Gambacorta_2025_GSICS.pdf manage 8 MB 26 Mar 2025 - 15:41 TimHewison  
7g_GSICS_MWSG_2025_JAXA.pdfpdf 7g_GSICS_MWSG_2025_JAXA.pdf manage 1 MB 26 Mar 2025 - 15:43 TimHewison  
7i MWRI TVAC by Pengjuan Yao.pdfpdf 7i MWRI TVAC by Pengjuan Yao.pdf manage 10 MB 25 Mar 2025 - 07:21 TimHewison  
7j_ESA passive microwave activities - GSICS 2025 report 20250319.pdfpdf 7j_ESA passive microwave activities - GSICS 2025 report 20250319.pdf manage 9 MB 25 Mar 2025 - 07:23 TimHewison  
7k Hewison - EPS-Sterna Inter-Calibration Study.pptxpptx 7k Hewison - EPS-Sterna Inter-Calibration Study.pptx manage 3 MB 25 Mar 2025 - 07:25 TimHewison  
7l Monitoring of FY-3 Microwave instruments performances using radiative transfer models and NWP data.pptxpptx 7l Monitoring of FY-3 Microwave instruments performances using radiative transfer models and NWP data.pptx manage 9 MB 25 Mar 2025 - 07:26 TimHewison  
7m EUMETSAT Vicarious Radiosonde Calibration.pptxpptx 7m EUMETSAT Vicarious Radiosonde Calibration.pptx manage 15 MB 25 Mar 2025 - 07:28 TimHewison  
7n Lide GSICS-2025-Lide_0319.pptxpptx 7n Lide GSICS-2025-Lide_0319.pptx manage 22 MB 13 Mar 2025 - 09:08 TimHewison  
8b_Yeeun_Lee_GEMS_V0.pptxpptx 8b_Yeeun_Lee_GEMS_V0.pptx manage 30 MB 26 Mar 2025 - 13:26 LarryFlynn Talk 8b
8d_Lindstrot-GOME-2_status_and_S4S5_outlook.pptxpptx 8d_Lindstrot-GOME-2_status_and_S4S5_outlook.pptx manage 25 MB 26 Mar 2025 - 13:27 LarryFlynn Talk 8d
8e_OMI-TROPOMI_Overview_KNMI-SteinZweers_20250319_final_to-upload.pptxpptx 8e_OMI-TROPOMI_Overview_KNMI-SteinZweers_20250319_final_to-upload.pptx manage 42 MB 26 Mar 2025 - 13:28 LarryFlynn Talk 8e
8f_TROPOMI-DLER_database_Loots.pptxpptx 8f_TROPOMI-DLER_database_Loots.pptx manage 6 MB 26 Mar 2025 - 13:28 LarryFlynn talk 8f
8g_TROPOMI-L1_UVN-cal-status-2025_Loots.pptxpptx 8g_TROPOMI-L1_UVN-cal-status-2025_Loots.pptx manage 5 MB 26 Mar 2025 - 13:29 LarryFlynn Talk 8g
8h_Lichtenberg_FDR4ATMOSStatus.pdfpdf 8h_Lichtenberg_FDR4ATMOSStatus.pdf manage 6 MB 26 Mar 2025 - 13:30 LarryFlynn Talk 8h
8i_SSIM_GSICS_JIN.pptxpptx 8i_SSIM_GSICS_JIN.pptx manage 5 MB 26 Mar 2025 - 13:31 LarryFlynn Talk 8i
8j_Xiaohu_Yang_The Inflight Calibration of the FY-3E SSIM VIS Band-V2.pptxpptx 8j_Xiaohu_Yang_The Inflight Calibration of the FY-3E SSIM VIS Band-V2.pptx manage 15 MB 26 Mar 2025 - 13:31 LarryFlynn Talk 8j
GSICS_Agency_Report_ 2025_Template2.pptxpptx GSICS_Agency_Report_ 2025_Template2.pptx manage 64 K 20 Jan 2025 - 22:35 ManikBali Agency Report Template
Information Package_GSICS.pdfpdf Information Package_GSICS.pdf manage 2 MB 17 Jan 2025 - 17:21 ManikBali Information Package
Topic revision: r32 - 02 Apr 2025, TimHewison
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSICS Wiki? Send feedback