Second Joint GSICS / IVOS Lunar Calibration Workshop in Xi'an (China), 13-17 November 2017

;

Agenda overview and logistics information for this workshop can be found here: http://gsics.nsmc.org.cn/portal/en/fycv/workshop201711.html

The main outcomes of the Lunar Calibration Workshop can be found in the Workshop Summary Workshop Summary and the full details are given in the Workshop Minutes.

You can find links to the GIRO model and previous meetings in the LunarWorkArea of the GSICS Development Wiki.

Outline of the agenda

The agenda of the workshop for the four days was the following:
  • Monday13/11: Measurements and Moon Observations
  • Tuesday14/11: am: Using the ROLO and the GIRO
  • Tuesday14/11: pm: Lunar Model Developments
  • Wednesday 15/11 : am: end of Lunar Model Developments + Inter-calibration and Inter-band Calibration
  • Wednesday 15/11 : pm: Alternative uses of lunar measurements (focus on MTF post-launch characterisation using lunar images)
  • Thursday 16/11 : am: end of Alternative uses of lunar measurements (ghost, X-talk, IR, etc.)
  • Thursday 16/11 : pm: Discussions and conclusions of the workshop (action/recommendation/plans/etc.)

Failed to include URL http://gsics.atmos.umd.edu/pub/Development/20171106/Agenda2017LunarCalibrationWorkshopTest.htm Protocol scheme 'https' is not supported (LWP::Protocol::https not installed)

Attendees

Summary

Action

I Attachment Action Size Date Who Comment
1d_Zhang_LunarCalibration.pptxpptx 1d_Zhang_LunarCalibration.pptx manage 9 MB 20 Nov 2017 - 06:08 MasayaTakahashi  
1e_Hu_GroundBasedLunarObsLijiang.pptppt 1e_Hu_GroundBasedLunarObsLijiang.ppt manage 25 MB 20 Nov 2017 - 06:08 MasayaTakahashi  
1f_Luo_LunarPhotometer.pptppt 1f_Luo_LunarPhotometer.ppt manage 9 MB 20 Nov 2017 - 06:08 MasayaTakahashi  
1g_Zhang_LunarObsFTIRImagingSpectrometer.pptxpptx 1g_Zhang_LunarObsFTIRImagingSpectrometer.pptx manage 8 MB 20 Nov 2017 - 06:09 MasayaTakahashi  
1i_Bouvet_Lunar_Irradiance_Measurements_And_Modelling.pptxpptx 1i_Bouvet_Lunar_Irradiance_Measurements_And_Modelling.pptx manage 25 MB 20 Nov 2017 - 06:09 MasayaTakahashi  
1l_Krijger_ESS-LU2-PP-004-Rev3_GOME2_Xian.pptxpptx 1l_Krijger_ESS-LU2-PP-004-Rev3_GOME2_Xian.pptx manage 4 MB 24 May 2018 - 08:17 SebastienWagner  
1n_Stone_CLARREO-ARCSTONE.pptxpptx 1n_Stone_CLARREO-ARCSTONE.pptx manage 1 MB 20 Nov 2017 - 06:09 MasayaTakahashi  
1p_Yang_CharacterizationCalibrationTraceabilityLunarObservation.pptxpptx 1p_Yang_CharacterizationCalibrationTraceabilityLunarObservation.pptx manage 2 MB 20 Nov 2017 - 06:09 MasayaTakahashi  
1q_Jiang_LunarObsPlanBasedOnSItraceableInstrument.pptppt 1q_Jiang_LunarObsPlanBasedOnSItraceableInstrument.ppt manage 6 MB 20 Nov 2017 - 06:09 MasayaTakahashi  
1s_Yu_DatasetCataloging.pptxpptx 1s_Yu_DatasetCataloging.pptx manage 1 MB 20 Nov 2017 - 06:10 MasayaTakahashi  
1t_Wagner_GLOD.pptxpptx 1t_Wagner_GLOD.pptx manage 1 MB 20 Nov 2017 - 06:10 MasayaTakahashi  
2a_Stone_ROLO-GIRO_data_prep.pptxpptx 2a_Stone_ROLO-GIRO_data_prep.pptx manage 194 K 20 Nov 2017 - 06:19 MasayaTakahashi  
2d_Xiong_MODIS_VIIRS_Lunar_CAL.pdfpdf 2d_Xiong_MODIS_VIIRS_Lunar_CAL.pdf manage 1 MB 20 Nov 2017 - 06:19 MasayaTakahashi  
2e_Kouyama_Data_Preparation_ASTER.pptxpptx 2e_Kouyama_Data_Preparation_ASTER.pptx manage 4 MB 20 Nov 2017 - 06:19 MasayaTakahashi  
2f_Wu_TanSat-FY3_LunarData.pptxpptx 2f_Wu_TanSat-FY3_LunarData.pptx manage 6 MB 20 Nov 2017 - 06:19 MasayaTakahashi  
2g_Adriaensen_data_preparation_PROBAV.pptxpptx 2g_Adriaensen_data_preparation_PROBAV.pptx manage 940 K 20 Nov 2017 - 06:19 MasayaTakahashi  
2h_Chen_LunarDataPreparationFY-2.pptppt 2h_Chen_LunarDataPreparationFY-2.ppt manage 4 MB 20 Nov 2017 - 06:19 MasayaTakahashi  
2j_Oh_LunarDataPreparationCOMS.pptxpptx 2j_Oh_LunarDataPreparationCOMS.pptx manage 4 MB 20 Nov 2017 - 06:20 MasayaTakahashi  
2k_Wagner_SEVIRI_DataPreparation_XianLunarCalWS2017.pptxpptx 2k_Wagner_SEVIRI_DataPreparation_XianLunarCalWS2017.pptx manage 3 MB 20 Nov 2017 - 06:20 MasayaTakahashi  
2l_Takahashi_AhiLunarData.pptxpptx 2l_Takahashi_AhiLunarData.pptx manage 10 MB 20 Nov 2017 - 06:20 MasayaTakahashi  
2m_Yu_ABILunarDataPreparation.pptxpptx 2m_Yu_ABILunarDataPreparation.pptx manage 3 MB 20 Nov 2017 - 06:20 MasayaTakahashi  
2o-Snel-SCIAMACHY.pptxpptx 2o-Snel-SCIAMACHY.pptx manage 249 MB 24 May 2018 - 08:18 SebastienWagner  
3a_Stone_ROLO_status.pptxpptx 3a_Stone_ROLO_status.pptx manage 515 K 20 Nov 2017 - 06:21 MasayaTakahashi  
3b_Wagner_GIRO_benchmark_XianLunarCalWS2017.pptxpptx 3b_Wagner_GIRO_benchmark_XianLunarCalWS2017.pptx manage 3 MB 20 Nov 2017 - 06:21 MasayaTakahashi  
3c_Wang_ComparsionLunarModelHyperspectralImager.pptxpptx 3c_Wang_ComparsionLunarModelHyperspectralImager.pptx manage 6 MB 20 Nov 2017 - 06:22 MasayaTakahashi  
3d_Zhang_NovelHyperspectralLunarIrradianceModel.pptxpptx 3d_Zhang_NovelHyperspectralLunarIrradianceModel.pptx manage 1 MB 20 Nov 2017 - 06:22 MasayaTakahashi  
3f_Kouyama_SELENE_SP_2017.pptxpptx 3f_Kouyama_SELENE_SP_2017.pptx manage 4 MB 20 Nov 2017 - 06:27 MasayaTakahashi  
3g_Zhang_NewLunarModelBasedOnSELENE-SPwithDEM.pptxpptx 3g_Zhang_NewLunarModelBasedOnSELENE-SPwithDEM.pptx manage 1 MB 20 Nov 2017 - 06:27 MasayaTakahashi  
3h_Wu_Lunar_Calibration_Workshop_20171023.pptxpptx 3h_Wu_Lunar_Calibration_Workshop_20171023.pptx manage 20 MB 20 Nov 2017 - 06:27 MasayaTakahashi  
3i_Yu_LunarRadianceCalibration.pptxpptx 3i_Yu_LunarRadianceCalibration.pptx manage 5 MB 20 Nov 2017 - 06:27 MasayaTakahashi  
4a2_Wagner_Interband_Calibration_using_the_Moon.pptxpptx 4a2_Wagner_Interband_Calibration_using_the_Moon.pptx manage 1 MB 20 Nov 2017 - 06:28 MasayaTakahashi  
4a_Wagner_Moving_toward_intercalibration_using_the_Moon_2017.pptxpptx 4a_Wagner_Moving_toward_intercalibration_using_the_Moon_2017.pptx manage 961 K 20 Nov 2017 - 06:27 MasayaTakahashi  
4b_Xiong_Reference_MODIS_2_VIIRS.pdfpdf 4b_Xiong_Reference_MODIS_2_VIIRS.pdf manage 988 K 20 Nov 2017 - 06:28 MasayaTakahashi  
4c_Takahashi_AhiLunarInterCal.pptxpptx 4c_Takahashi_AhiLunarInterCal.pptx manage 4 MB 20 Nov 2017 - 06:28 MasayaTakahashi  
4d_Xiong_CAL_Inter_Comarison.pdfpdf 4d_Xiong_CAL_Inter_Comarison.pdf manage 1 MB 20 Nov 2017 - 06:28 MasayaTakahashi  
4e_Zhang_IntercalibrationUsingMoonToBridgeInstruments.pptxpptx 4e_Zhang_IntercalibrationUsingMoonToBridgeInstruments.pptx manage 1 MB 20 Nov 2017 - 06:28 MasayaTakahashi  
4f_Adriaensen_interband_calibration_PROBAV.pptxpptx 4f_Adriaensen_interband_calibration_PROBAV.pptx manage 787 K 20 Nov 2017 - 06:29 MasayaTakahashi  
5a_Wu_Introduction.pptxpptx 5a_Wu_Introduction.pptx manage 80 K 20 Nov 2017 - 06:29 MasayaTakahashi  
5b_Shao_MTF_Presentation.pptxpptx 5b_Shao_MTF_Presentation.pptx manage 3 MB 20 Nov 2017 - 06:29 MasayaTakahashi  
5c_Wagner_MTF_estimation.pptxpptx 5c_Wagner_MTF_estimation.pptx manage 7 MB 20 Nov 2017 - 06:29 MasayaTakahashi  
5d_Takahashi_Ahi8LunarMtf.pptxpptx 5d_Takahashi_Ahi8LunarMtf.pptx manage 1 MB 20 Nov 2017 - 06:29 MasayaTakahashi  
5e_Chen_MTF_analysis_FY-2G.pptxpptx 5e_Chen_MTF_analysis_FY-2G.pptx manage 3 MB 20 Nov 2017 - 06:29 MasayaTakahashi  
5f_Min_FY3C_MTF_NSMC_20171115_xian.pptxpptx 5f_Min_FY3C_MTF_NSMC_20171115_xian.pptx manage 24 MB 20 Nov 2017 - 06:30 MasayaTakahashi  
5g_Adriaensen_MTF_evaluation_PROBAV.pptxpptx 5g_Adriaensen_MTF_evaluation_PROBAV.pptx manage 475 K 20 Nov 2017 - 06:30 MasayaTakahashi  
5h_MTF_discussions.pptxpptx 5h_MTF_discussions.pptx manage 41 K 20 Nov 2017 - 06:30 MasayaTakahashi  
5i_CHO_GOCI-II Lunar calibration and MTF measurement plan-v1.1.pdfpdf 5i_CHO_GOCI-II Lunar calibration and MTF measurement plan-v1.1.pdf manage 2 MB 20 Nov 2017 - 06:30 MasayaTakahashi  
5j_Kouyama_SmallSatellite_Japan.pptxpptx 5j_Kouyama_SmallSatellite_Japan.pptx manage 5 MB 20 Nov 2017 - 06:30 MasayaTakahashi  
5k_Ong_Landsat8_Lunar_Calibrations.pdfpdf 5k_Ong_Landsat8_Lunar_Calibrations.pdf manage 14 MB 20 Nov 2017 - 06:31 MasayaTakahashi  
5k_Xiong_MODIS_PC_Optical_Leak.pdfpdf 5k_Xiong_MODIS_PC_Optical_Leak.pdf manage 1 MB 20 Nov 2017 - 06:32 MasayaTakahashi  
5l_Wilson_GSICS_MODIS_Xtalk_2017.pptxpptx 5l_Wilson_GSICS_MODIS_Xtalk_2017.pptx manage 6 MB 20 Nov 2017 - 06:32 MasayaTakahashi  
5m_Yu_ABIxtalking.pptxpptx 5m_Yu_ABIxtalking.pptx manage 1 MB 20 Nov 2017 - 06:33 MasayaTakahashi  
5o-Gu_DraftPlanofLunarCaliforFY-3MWHS.pptppt 5o-Gu_DraftPlanofLunarCaliforFY-3MWHS.ppt manage 8 MB 20 Nov 2017 - 06:33 MasayaTakahashi  
6f_Wagner_Wrapup_LCWS_Xian2017.pptxpptx 6f_Wagner_Wrapup_LCWS_Xian2017.pptx manage 1 MB 20 Nov 2017 - 06:40 MasayaTakahashi  
Agenda2017LunarCalibrationWorkshop.htmhtm Agenda2017LunarCalibrationWorkshop.htm manage 130 K 13 Nov 2017 - 09:45 TimHewison  
Agenda2017LunarCalibrationWorkshopTest.htmhtm Agenda2017LunarCalibrationWorkshopTest.htm manage 130 K 06 Dec 2019 - 13:56 SebastienWagner  
Final Minutes - Second Lunar Calibration Workshop - Xian 2017.pdfpdf Final Minutes - Second Lunar Calibration Workshop - Xian 2017.pdf manage 952 K 06 Dec 2019 - 11:25 SebastienWagner  
LunarCalibWS_Xian2017.jpgjpg LunarCalibWS_Xian2017.jpg manage 278 K 06 Dec 2019 - 13:17 SebastienWagner  
Summary - Second Lunar Calibration Workshop - Xian 2017.pdfpdf Summary - Second Lunar Calibration Workshop - Xian 2017.pdf manage 728 K 06 Dec 2019 - 11:26 SebastienWagner  
Topic revision: r10 - 06 Dec 2019, SebastienWagner
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding GSICS Wiki? Send feedback